Planning of distribution networks islanded operation: from simulation to live demonstration

J. Gouveia, C. Gouveia, J. Rodrigues, L. Carvalho, C. L. Moreira, J. A.Peças Lopes

Resultado de pesquisarevisão de pares

6 Citações (Scopus)

Resumo

The integration of distributed Battery Energy Storage Systems (BESS) at the Medium Voltage (MV) and Low Voltage (LV) networks increases the distribution grid flexibility to deal with high penetration of Renewable Energy Sources (RES). In addition, it also enables the deployment of key self-healing functionalities, which allow the islanded operation of small sections of the distribution network. However, new planning and real-time operation strategies are required to allow the BESS coordinated control, as well as a cost-effective and stable operation. This paper presents new tools developed for the planning and real-time operation of distribution networks integrating BESS, particularly when operating islanding. For real-time operation, a short-term emergency operation-planning tool assesses the feasibility of islanded operation of a small section of the distribution network. The long-term impact of a BESS control strategy for islanded operation is assessed through a Life Cycle Analysis (LCA) tool. The results and implementation experience in real distribution network are also discussed.

Idioma originalInglês
Número do artigo106561
RevistaElectric Power Systems Research
Volume189
DOIs
Estado da publicaçãoPublicadas - dez. 2020
Publicado externamenteSim

Nota bibliográfica

Publisher Copyright:
© 2020

Financiamento

Financiadoras/-esNúmero do financiador
Ci?ncia e a Tecnologia
Fundação para a Ciência e a TecnologiaUID/EEA/50014/2019

    Impressão digital

    Mergulhe nos tópicos de investigação de “Planning of distribution networks islanded operation: from simulation to live demonstration“. Em conjunto formam uma impressão digital única.

    Citar isto