Abstract

The integration of distributed Battery Energy Storage Systems (BESS) at the Medium Voltage (MV) and Low Voltage (LV) networks increases the distribution grid flexibility to deal with high penetration of Renewable Energy Sources (RES). In addition, it also enables the deployment of key self-healing functionalities, which allow the islanded operation of small sections of the distribution network. However, new planning and real-time operation strategies are required to allow the BESS coordinated control, as well as a cost-effective and stable operation. This paper presents new tools developed for the planning and real-time operation of distribution networks integrating BESS, particularly when operating islanding. For real-time operation, a short-term emergency operation-planning tool assesses the feasibility of islanded operation of a small section of the distribution network. The long-term impact of a BESS control strategy for islanded operation is assessed through a Life Cycle Analysis (LCA) tool. The results and implementation experience in real distribution network are also discussed.

Original languageEnglish
Article number106561
JournalElectric Power Systems Research
Volume189
DOIs
Publication statusPublished - Dec 2020
Externally publishedYes

Bibliographical note

Publisher Copyright:
© 2020

Keywords

  • Battery energy storage
  • Flexibility
  • Islanding operation
  • Life cycle analysis
  • Microgrid
  • Reliability

Fingerprint

Dive into the research topics of 'Planning of distribution networks islanded operation: from simulation to live demonstration'. Together they form a unique fingerprint.

Cite this